Hello all,
I am using ecoinvent database 3.7.1 in openLCA 1.10.3.
I go for the consequential system model, so I made sure that every flow I inserted in the input/output table is the consequential one.
Once I created the product system (Prefer default providers; Preferred process type: System process) and calculated the LCIA for IPCC 2013 GWP 100a, I found that there are several APOS processes linked in my product system.
Is this normal? I thought that if I choose Consequential providers(process) then it should always link to marginal suppliers (which is only used in the consequential method).
Could you explain what is the possible reason for this? Perhaps this is the linking algorithm of the consequential system model in ecoinvent's database?
Thank you in advance for your help!
Best